Vestas has received an order for a repowering project consisting of nine V117-3.45 MW turbines from Bürger-Windpark Lübke-Koog Nord GmbH & Co.KG. The order includes supply and commissioning of the wind turbines, as well as a 20-year full-scope Active Output Management 5000 (AOM5000) service agreement.
Product Model | Inside Diameter | Outside Diameter | Thickness |
F69/2.5 bearing | 2.5 | 7 | 2.5 |
F69/2.5-Z bearing | 2.5 | 7 | 3.5 |