With the end of the technical improvement and the equipment are set at positions the forging plant put the focus from technical improvement to the equipment capability exerting and management level improvement.
Setting the site management standard. Clear identification and marking to distinguish the fire engine access material area and products area; Clear the passage and route and standardize the place height of forgings on the site; Clear the criteria of equipment maintenance lubrication and wiping as well as the floor cleaness.Strengthning the surrounding sanitary management and further enhance the image.
Product Model | Inside Diameter | Outside Diameter | Thickness |
6315ZZ NSK | 75 | 160 | 37 |
6215ZZ NSK | 75 | 130 | 25 |