• Hello Customer - Log in or Register!
Date: 2013-07-31

Sinovel Builds Demonstration Project in Sweden

Two Sinovel SL3000 3MW turbines have come into service in a wind farm 35km northeast of Karlstad in central Sweden on 29 February.

The turbines stand 150 metres high, with a rotor diameter of 113 metres. CRC Vindkraft AB, the wind farm developer, spent SK 84 million ($12.85 million) to buy the two turbines.

They are expected to generate 15,000MWh electric power in a year to satisfy annual power consumption in 3,000 households.

Li Lecheng, senior vice-president of Sinovel, said the project is of demonstration effect for Sinovel. If Sinovel turbines are accepted by local users for the quality and technology, and meet no problem in access to the grid, it will pave the way for its turbines to enter the European market.

On June 10, 2011, CRC Vindkraft AB signed the procurement contract for the two 3MW turbines with Sinovel in Beijing. It marked the first time that China-made wind turbine entering the Swedish market.


Previous: Xingcheng Special Steel Launches New Alloy Materials Project
Next: Baoshan Steel to Sell Assets to Baosteel

Hot Products:
Product Model Inside Diameter Outside Diameter Thickness
NA69/32U IKO 32 52 37
NA69/28UU IKO 28 45 31
【TradeBearings News Statement】

1.The news above mentioned with detailed source are from internet.We are trying our best to assure they are accurate ,timely and safe so as to let bearing users and sellers read more related info.However, it doesn't mean we agree with any point of view referred in above contents and we are not responsible for the authenticity. If you want to publish the news,please note the source and you will be legally responsible for the news published.
2.All news edited and translated by us are specially noted the source"TradeBearings".
3.For investors,please be cautious for all news.We don't bear any damage brought by late and inaccurate news.
4.If the news we published involves copyright of yours,just let us know.