• Hello Customer - Log in or Register!
Date: 2013-08-01

New Brazilian Rod Mill Supplied by Morgan Construction

New Brazilian Rod Mill Supplied by Morgan Construction

Morgan Construction Company has won the contract to supply a single strand wire rod mill for Votorantim Metais in Resende, Rio de Janeiro, Brazil.

The project design allows for future expansion to two strands for rod production of up to one million tonnes per year. The mill will roll plain rod from 5.5mm to 24mm and HYQST rebar from 6.35mm to 16mm. Rolling speed for the 5.5mm rod will be guaranteed at 105 meters per second. Initial furnace capacity should produce 120 tonnes per hour, rising to 180 tonnes per hour when the second strand is built.


Previous: Website is Dedicated to Plastic Bearings
Next: Hephaestus Holdings, Inc. to Acquire North American Wheel Bearings

Hot Products:
Product Model Inside Diameter Outside Diameter Thickness
BR15 bearing
BR14 bearing 1.0000 1.9800 0.5600
【TradeBearings News Statement】

1.The news above mentioned with detailed source are from internet.We are trying our best to assure they are accurate ,timely and safe so as to let bearing users and sellers read more related info.However, it doesn't mean we agree with any point of view referred in above contents and we are not responsible for the authenticity. If you want to publish the news,please note the source and you will be legally responsible for the news published.
2.All news edited and translated by us are specially noted the source"TradeBearings".
3.For investors,please be cautious for all news.We don't bear any damage brought by late and inaccurate news.
4.If the news we published involves copyright of yours,just let us know.