Igus 'Energy Chains and Cables Checked During Downtime
Igus engineers will be available once again this year to examine energy chains and flexible cables free of charge before or during factory shutdowns in July and August. Those involved with maintenance or production are invited to take advantage of the free inspections either before or during the shutdown period.
Igus energy chains and cables are stocked at the company's warehouse in Northampton, and so replacement parts can normally be delivered in time for installation during the same shutdown.
Product Model | Inside Diameter | Outside Diameter | Thickness |
GE16PW bearing | 16 | 32 | 21 |
GE14PW bearing | 14 | 28 | 19 |