• Hello Customer - Log in or Register!
Date: 2013-08-01

Free Energy-chain Checkups for Factory Shutdowns

Igus is inviting maintenance engineers to book a free energy-chain and flexible-cable annual checkup before or during factory shutdowns scheduled in July and August.

The company can ensure that replacement parts are delivered and that engineers are at hand during shutdown.

In addition, as Igus stocks its E-Chains and cables at its facility in Northampton, replacement parts can normally be delivered and installed during the same shutdown period.


Previous: RBC Bearings Q4 Results Beat Wall Street Estimates
Next: SKF India hosts

Hot Products:
Product Model Inside Diameter Outside Diameter Thickness
6838ZZ KOYO 190 240 24
6236-1ZZX KOYO 180 320 52
【TradeBearings News Statement】

1.The news above mentioned with detailed source are from internet.We are trying our best to assure they are accurate ,timely and safe so as to let bearing users and sellers read more related info.However, it doesn't mean we agree with any point of view referred in above contents and we are not responsible for the authenticity. If you want to publish the news,please note the source and you will be legally responsible for the news published.
2.All news edited and translated by us are specially noted the source"TradeBearings".
3.For investors,please be cautious for all news.We don't bear any damage brought by late and inaccurate news.
4.If the news we published involves copyright of yours,just let us know.