• Hello Customer - Log in or Register!
Date: 2013-07-31

CGNPC's 99,000 kilowatts wind power project in Santanghu and Altay approved

On September 14, the Development and Reform Commission Xinjiang Autonomous Region formally issued a document to announce the approval of China Guangdong Nuclear Power Company (CGNPC)'s first stage construction of 99,000 kilowatts wind power project in Santanghu and Altay.

At this point, CGNPC's wind power installed capacity approved in Xinjiang has accumulated to 566,000 kilowatts, wherein, the newly approved capacity this year is 467,000 kilowatts, and that included in the approved wind power planned capacity in the national "12th Five" is 368,000 kilowatts.


Previous: 2012 Shanghai International Bearing Summit Come to a Successful Conclusion
Next: Hongsida invested 300 million yuan in Lujiang for construction of a large-scale CNC machine tools project

Hot Products:
Product Model Inside Diameter Outside Diameter Thickness
NAXI2530 IKO 42 20.5
NAXI2030Z IKO 37 20.5
【TradeBearings News Statement】

1.The news above mentioned with detailed source are from internet.We are trying our best to assure they are accurate ,timely and safe so as to let bearing users and sellers read more related info.However, it doesn't mean we agree with any point of view referred in above contents and we are not responsible for the authenticity. If you want to publish the news,please note the source and you will be legally responsible for the news published.
2.All news edited and translated by us are specially noted the source"TradeBearings".
3.For investors,please be cautious for all news.We don't bear any damage brought by late and inaccurate news.
4.If the news we published involves copyright of yours,just let us know.